By admin Uncategorized The lower part and the top part of the 281-tonne dome for the reactor building at unit 3 of India’s Kudankulam nuclear power plant was preassembled on the ground before being lifted 62 metres and installed in the design position Previous Post Greece would undermine its security by sending air defenses to Ukraine Next Post Why Putin says Russia could adopt US-style preemptive strike doctrine